Pitt County Industrial Park Sites
Indigreen Corporate Park
Indigreen Corporate Park, located in Greenville, NC, offers companies the essentials to stay competitive in the global marketplace. Its strategic position at the center of America's Eastern Seaboard makes the new 285 acre park accessible to customers and suppliers throughout the region. A location at Indigreen also provides employers with access to the area's highly productive, well trained workforce.
Indigreen sites are equipped with all underground utilities-including digital fiber optic cable-which add to the park's attractiveness and assure a high degree of service reliability. The park is a short drive from Interstates 40 and 95 via new four lane highways, and is within two miles of the Pitt/Greenville Airport. Cleared and wooded lots range in size from 5 to 42 acres and are construction-ready without the costly delays of infrastructure improvements. Indigreen has protective covenants in place to secure a company's investment within the park.

Indigreen's tenants and neighbors are as attractive as the park itself. ASMO, Overton's,
DSM, Fuji Silysia, and NACCO are just a few of the major corporations which have taken advantage of the area's pro-business environment. Continued
expansion within these local plants demonstrates the success achievable with an investment at Indigreen.

Aerial Photo of the Indigreen Industrial Park

Photo of Industrial Building in Indigreen

Area Map for Indigreen Park
| General |
Size |
285 acres (105 acres in Phase I) |
| Lot Sizes: |
5.63 acres to 42.0 acres |
| Ownership: |
Greenville Industries, Inc. |
| Location: |
Greenville Industrial Park,
Greenville, NC
Pactolus Township, Pitt County,
Greenville NC MSA, USA |
| Current Use: |
Idle timberland/farmland |
| Zoning: |
Planned Light Industry (PIU) |
| |
| Physical: |
Elevation: |
32' to 40' above MSL |
| Appearance: |
Slightly elevated above road grade
±55 acres cleared, 230 wooded |
| Soils: |
Bladen/Exum fine sandy loams with load
bearing capacities of 3000 lbs. per sq.ft.;
Preliminary soil test results are available |
| Drainage: |
Corporation has constructed drainage ditches on reserved easements |
| Environmental: |
Certified by US Army Corps of Engineers to be 100% non-wetlands. Phase I environmental review shows no evidence of environmental contamination |
| |
| Transportation: |
Access: |
Sugg Parkway (28' pavement on 80' R/W) |
| Highway: |
Direct access to US 264 Bypass |
| Freeway: |
US 264 becomes a controlled access, interstate quality highway one mile west of site |
| Interstate: |
I-95 is within 40 miles via US 264 |
| Air(commercial): |
Pitt-Greenville Airport is within 2 miles of site. |
| |
| Utilities |
Water: |
12" (Greenville Utilities Commission) |
| Sewer: |
12" and 15" (Greenville Utilities Commission) |
| Gas: |
4" (Greenville Utilities Commission) |
| Electric: |
12.5 KV Distribution (Greenville Utilities Commission)
Substation within 1000 feet;
2 Transformers @ 20,000 KVA |
| Telephone: |
Fiber Optic Cable with digital switching |
|
|